Reserved, the connector is reserved for long press 10 meters/side. In order to facilitate maintenance, when laying the cable, the joint well should be 1#, and the order should be analogized. Every hand hole that is a multiple of 5, 10, 15. 5 should be. Minimize mechanical pressure on the outer sheath at crossing points: (armoured) cables crossing each other generate points of high pressure, so it is important when laying in figure 8 loops it is done in a correct way. When laying loops of fiber on a surface during a pull, use “figure-8” loops to. This guide outlines key procedures and technical considerations, covering pre-installation checks, installation in various environments, cable fixing and spacing, joint and terminal production, and safety precautions. Amount and type of splices and segregations used in every section, specifying their location is well. If possible, use an automated puller with tension control or at least a breakaway-pulling eye. Here Dd is the inner diameter of the duct and Dc the diameter of the cables.